Operationalization of the 1st berth of the Lamu Port
The LAPSSET Corridor Program is Eastern Africa’s largest and most ambitious infrastructure project bringing together Kenya, Ethiopia and South Sudan. This mega project consists of seven key infrastructure projects starting with a new 32 Berth port at Lamu (Kenya); Interregional Highways from Lamu to Isiolo, Isiolo to Juba (South Sudan), Isiolo to Addis Ababa (Ethiopia), and Lamu to Garsen (Kenya), Crude Oil Pipeline from Lamu to Isiolo, Isiolo to Juba; Product Oil Pipeline from Lamu to Isiolo, Isiolo to Addis Ababa; Interregional Standard Gauge Railway lines from Lamu to Isiolo, Isiolo to Juba, Isiolo to Addis Ababa, and Nairobi to Isiolo; 3 International Airports: one each at Lamu, Isiolo, and Lake Turkana; 3 Resort Cities: one each at Lamu, Isiolo and Lake Turkana; and The multipurpose High Grand Falls Dam along the Tana River.
On May 20 ,2021, the Republic of Kenya President H. E Hon. Uhuru Kenyatta presided over the of the 32-berth Lamu Seaport . The National Treasury and Planning Cabinet Secretary Amb. Ukur Yatani was among those who attended the function.